
Scaffolding assembled
Solar panels installed
Electrical equipment installed
Cables connected
Scaffolding will be erected where required for safe access.
Solar panels will be installed using industry-approved mounting systems.
Electrical equipment will be installed internally, typically in your loft, garage, utility room or similar location.
Cabling will be installed between the roof and electrical equipment. The system will be connected to a new customer unit (fuse board), which is separate from your existing board.
Installation typically takes 2 - 3 days.


Minimal Disruption to Your Day
Most residential rooftop solar and battery installations take just one to two days to complete. Our qualified installation team handles every technical detail while keeping your home spotless throughout.
Your power will only be paused for under an hour during final connection testing. Before we leave, we ensure you know exactly how to track your real-time generation and savings.
Ready to Switch to Solar?
Get a personalized rooftop solar and storage recommendation for your property with our instant online calculator tool.
Keco Energy Ltd
Company Number: 15400853
Registered at:
C/O Venture Finance Management
Suite 101, Cotton Exchange
Old Hall Street
Liverpool
L3 9LQ
United Kingdom
© 2026. All rights reserved.
Follow us
Privacy Policy
Contact us
Phone:
0151 662 0808
Email:
info@kecoenergy.co.uk
Quick links
Keco Energy Ltd (Financial Services Register No. 1048376) is an Introducer Appointed Representative of Hometree Finance, a trading name of HTG Finance Limited, which is authorised and regulated by the Financial Conduct Authority (Financial Services Register No. 825534).
